Four published budgets, one rule: free remedies before purchases
Most calculators tell you whether a build fits. Break It Yourself shows the exact published specification line you cross when it does not, describes the failure mode that follows, and ranks every way back inside the budget with $0 configuration changes listed first. Where a hardware change is the genuine next step, the lab names the required specification tier rather than inventing an undated retail price.
What each hall cites
| Hall | Cited Standard or Vendor Document | Failure Mode Simulated |
|---|---|---|
| 01 · Display Link Overloader | VESA CVT-RBv2 timing (80 px H-blank, 460 µs min V-blank), VESA DSC 8 bpp target, HDMI 2.0/2.1 & DP 1.2/1.4a/2.1 payload ceilings | EDID refresh-rate drop, silent 4:2:0 fallback, or link-training blackouts |
| 02 · Blackout & Handover Drill | CyberPower & Schneider Electric Smart-UPS runtime/transfer tables (checked 2026-11-18) + Intel ATX 3.1 Rev 2.1a hold-up minimums (≥17 ms @ 80%, ≥12 ms @ 100%) | Inverter overload trip, switchover reset when hold-up ≤ transfer time, or battery exhaustion before ZFS shutdown |
| 03 · PSU & Pigtail Excursion | PCI-SIG CEM 5.1 12V-2x6 sense coding (600/450/300 W), single 8-pin (150 W + 75 W slot = 225 W), Intel ATX 3.1 200% 100 µs excursion | Connector thermal overload on daisy-chained pigtails or instant OCP black-screen resets on legacy ATX 2.x units |
| 04 · Dusk PoE & Host RAM OOM | IEEE 802.3af (12.95 W PD), 802.3at (25.5 W PD), 802.3bt Type 3 (51.0 W PD) + OpenZFS Linux zfs_arc_max default (50% host RAM) | Dusk IR camera/AP port cutoffs and Linux OOM-killer terminating VMs before ZFS ARC evicts |